Our system has been installed on Yongmao STT3930-200T, The World's Largest Tower Cranein 2019.This tower crane hasbeen used in Nanjing Puyi Bridge Project Construction
Alfara'a in DubaiNingbo Sanxing Heavy Industry ShipyardNantong, Jiangsu (Hutong Yangtze River Bridge)Kuwait University City Projectstar cify BYMAsite in MyanmarMDC Construction Site in Philippines
On December 22, 2015, the first pot of concrete was poured into the bottom plate of nuclear island of Fuqing Nuclear Power Unit 6, a demonstration project of China's nuclear power brand "Hualong No.1", which marked that the demonstration project of "Hualong No.1" entered a comprehensive construction stage."Hualong No.1" is a three-generation advanced PWR nuclear power technology independently developed by China, which meets the latest global nuclear safety standards.Fuqing nuclear power plant uses Fushun Yongmao Construction Machinery Co., Ltd. tower cranes.Our company supplied 23 sets of CXT/90-IIB tower crane anti-collision&zone protection systems, video monitoring systems and ground monitoring systems, including 4 sets of track walking systems for this project. The number of tower cranes connected by a single network has reached the highest record in China at that time.It also reaches the international advanced level and maintaining the leading position in the same industry in China
In July 2019, CNNC Huachen and CNNC 22 Gansu Nuclear Technology Industrial Park projects used our CXT/90-IIA tower crane multifunction indicator system. By July 2020, 28 sets of our systems had been installed and a comprehensive after-sales service inspection had been conducted.
The Lianghekou Hydropower Project chooses our load moment indicator CXT/90-IIC and tower crane camera CXT/110A.The road is very far away, with an altitude of 3,580 meters,lack of oxygen and nosebleeds. Our engineer went up and down more than 120 meter tower crane for more than 6 times a day, and the products were also need to be carried to the tower crane by him.Our engineer overcame all the difficulty and install the system successfully.Our work have been highly recognized by the construction site,supervision department and the owner!
In June 2019, CNNC 24 Zhangzhou Nuclear Power Project chooses our tower crane anti-collision&zoneprotectionsystem(CXT/90-IIB),multi-function indicator(CXT/90-IIA),tower crane camera system (CXT/110A) and ground monitoring system,On the basis of our regular products, they put forward more stringent requirements from software improvement to hardware allocation. We delivered the products on time and on quality.